Step 1: Decide what kind of project it is
Bathroom Brigade publishes three full-remodel tiers and five individual service ranges. They are typical Northern Virginia reference ranges, not quotes, but they are a sound starting point.
| Tier | Typical Scope | Range |
|---|---|---|
| Basic | Same footprint, standard fixtures and tile. | $12,000–$25,000 |
| Mid-Range | New tile, vanity, and shower, with some layout changes. | $25,000–$40,000 |
| High-End | Full layout change, curbless or custom shower, premium fixtures. | $40,000–$70,000+ |
Typical Northern Virginia reference ranges from Bathroom Brigade's published cost guide. They are a starting point for planning, not a quote. Your written scope sets the actual price for your Ashburn bathroom.
- Basic: same footprint, standard fixtures and tile. Everything stays where it is; you are replacing finishes.
- Mid-range: new tile, vanity and shower, with some layout changes, such as a tub-to-shower conversion or a larger vanity.
- High-end: full layout change, curbless or custom shower, premium fixtures.
If you only need one part of the room done, the individual service ranges apply instead.
| Tier | Typical Scope | Range |
|---|---|---|
| Walk-In Showers & Tub Conversions | Replacing an old tub with a walk-in shower, or upgrading an existing one. | $8,000–$18,000 |
| Vanities & Countertops | Sized and installed to fit your bathroom's footprint and storage needs. | $2,500–$8,000 |
| Tile & Flooring | Shower surrounds, floors, and backsplashes installed to hold up to daily use. | $3,000–$9,000 |
| Electrical & Lighting | Vanity lighting, exhaust fans, and code-compliant wiring for wet locations. | $1,500–$5,000 |
| Aging-in-Place Upgrades | Grab bars, curbless showers, and layout changes for long-term accessibility. | $3,000–$12,000 |
Typical Northern Virginia reference ranges from Bathroom Brigade's published cost guide. They are a starting point for planning, not a quote. Your written scope sets the actual price for your Ashburn bathroom.
Step 2: Find the decisions that move the number
Moving plumbing
This is the biggest single lever. Keeping the toilet, shower and sink where the drains already are keeps you closer to the basic tier. Relocating them is what pushes a remodel up a tier.
Tile area and pattern
Full-height tile, mosaics and patterns such as herringbone add material and labor. A half-height wainscot or a large-format tile reduces both.
Fixture tier
Faucets, shower systems, vanities and toilets vary widely. Picking them during the Select step, before demolition, keeps the budget from drifting.
Accessibility
Curbless showers, grab bar blocking and layout changes add scope. They can be worth it, but price them deliberately.
Step 3: Leave room for what is behind the walls
In homes of any age, opening a wall or floor can reveal old leaks, a fan duct that vents into the attic, or wiring that needs updating. Keep a contingency in your own budget for this, and make sure the written scope says how discovered conditions will be priced and approved.
Step 4: Include permits
Ashburn remodels that change plumbing, electrical or mechanical systems go through Loudoun County permits and inspections. Ask each contractor whether permits are included and who coordinates inspections. The county publishes its own fees; we do not repeat them here.
Step 5: Compare estimates on the same scope
Two estimates are only comparable if they describe the same work. Line them up item by item:
- Demolition, disposal and protection
- Waterproofing method for the shower and tub
- Each fixture by product, or the allowance amount
- Plumbing and electrical work, including relocation
- Permits and inspections
- Paint, trim and drywall repair
- Exclusions and how changes are handled
A noticeably lower number often means something is missing, most commonly the waterproofing detail or the permit work.
Try the numbers yourself
Bathroom Brigade's instant bathroom estimate tool lets you add photos and measurements, pick fixtures and tile, and receive an estimate packet by email. It is a starting point, not a quote, but it is a useful way to see how choices change the total before anyone visits.
Where to save and where not to
- Save: keep fixtures where the drains already are.
- Save: use a simpler tile layout or tile only part of the walls.
- Save: choose standard fixtures in the finish you like.
- Do not skimp: waterproofing behind and under the shower.
- Do not skimp: a properly sized exhaust fan vented outdoors.
- Do not skimp: blocking for grab bars, if you plan to stay long-term.
The items in the second half of that list are invisible once the bathroom is finished, which is exactly why they get cut. They are also the expensive ones to fix later, because fixing them means tearing out finished tile.
Putting it together
A simple way to set your number: pick the tier that matches your layout plan, place yourself low, middle or high in that range based on tile coverage and fixture choices, then add your own contingency on top. Bring that number to the consultation. A contractor who knows your budget up front can tell you early whether the plan fits it, or which decisions would bring it into line, rather than presenting a scope you then have to cut back.


Both photos are from Ashburn projects: a double vanity with a quartz countertop, and a marble-tiled soaking tub.
What is a realistic budget for a bathroom remodel in Ashburn?▸
Bathroom Brigade's published ranges are $12,000–$25,000 for basic, $25,000–$40,000 for mid-range and $40,000–$70,000+ for high-end full remodels. Where your bathroom lands depends on layout changes, tile and fixtures.
How do I keep my remodel in the basic tier?▸
Keep fixtures in their current locations, choose standard fixtures and tile, and limit tile coverage. Moving plumbing is the biggest jump in cost.
Should I budget a contingency?▸
Yes. Concealed conditions behind walls and floors are common in remodels. Make sure your written scope explains how they will be priced and approved.
Do you offer financing?▸
We do not publish financing offers. Ask during your consultation about payment terms for your project.
